{"id":92,"date":"2022-07-05T15:22:25","date_gmt":"2022-07-05T15:22:25","guid":{"rendered":"http:\/\/versicolor.ca\/nstriad\/?page_id=92"},"modified":"2023-06-07T13:36:24","modified_gmt":"2023-06-07T13:36:24","slug":"timeline","status":"publish","type":"page","link":"https:\/\/versicolor.ca\/nstriad\/ns-triad\/timeline\/","title":{"rendered":"Timeline"},"content":{"rendered":"<p><em>Needs Updating:  last updates Aug 4, 2022<\/em><\/p>\n<p><strong>The current* NS Government&#8217;s Commitment<\/strong> (clause 10 in the <a href=\"https:\/\/nslegislature.ca\/legc\/bills\/64th_1st\/3rd_read\/b057.htm\">Environmental Goals and Climate Change Reduction Act<\/a>, As Passed on Nov 5, 2021, bolding inserted):<br \/>\n*<span style=\"font-size: 85%;\">A PC Government was elected with a majority\u00a0 on Aug 17, 2021, replacing two successive Liberal Governments (2013-2019).<\/span><\/p>\n<blockquote><p><strong><em><span style=\"color: #996633;\">\u00a0The Government&#8217;s goals with respect to the protection of land are<\/span><\/em><\/strong><\/p>\n<p><em>(a) <strong><span style=\"color: #996633;\">to conserve at least 20% of the total land and water mass of the Province by 2030<\/span><\/strong> as protected areas and other effective area-based conservation measures, including Indigenous Protected and Conserved Areas, in a manner consistent with national reporting criteria;<\/em><\/p>\n<p><em>(b) to support the goal in clause (a) with <strong><span style=\"color: #996633;\">a collaborative protected areas strategy to be released by December 31, 2023<\/span><\/strong>;<\/em><\/p>\n<p><em>(c)<strong><span style=\"color: #996633;\"> to implement by 2023 an ecological forestry approach for Crown lands,<\/span><\/strong> consistent with the recommendations in &#8220;An Independent Review of Forest Practices in Nova Scotia&#8221; prepared by William Lahey in 2018, through the triad model of forest management that prioritizes the sustainability of ecosystems and biodiversity in the Province; and<\/em><\/p>\n<p><em>(d) <strong><span style=\"color: #996633;\">to identify by 2023 the percentage allocation of Crown land dedicated to each pillar of the triad model of forest management<\/span><\/strong> referred to in clause (c).<\/em><\/p><\/blockquote>\n<p><strong>The Planning Process<\/strong><br \/>\nThe recommendation to manage NS&#8217;s forested Crown lands under a Forest Triad approach was a key component of the <a href=\"http:\/\/versicolor.ca\/nstriad\/fpr-2018\/\">Forest Practices Review<\/a> tabled on Aug 21, 2018. On June 25, 2019, the Department of Lands and Forestry announced <a href=\"https:\/\/web.archive.org\/web\/20191002090949\/https:\/\/novascotia.ca\/natr\/forestry\/Forest_Review\/\">8 Priority Projects<\/a>. The projects are listed below with links to the information docs issued June 25, 2019 (poss. slow downloading as they are on the Web Archive):<\/p>\n<ul>\n<li><a href=\"https:\/\/web.archive.org\/web\/20191002090949\/https:\/\/novascotia.ca\/natr\/forestry\/Forest_Review\/docs\/06252019\/June_25_Forest_Management_Guide.pdf\">FOREST MANAGEMENT GUIDE<\/a> (1)<\/li>\n<li><a href=\"https:\/\/web.archive.org\/web\/20191002090949\/https:\/\/novascotia.ca\/natr\/forestry\/Forest_Review\/docs\/06252019\/June_25_High_Production_Forestry.pdf\">HIGH-PRODUCTION FORESTRY<\/a> (2)<\/li>\n<li><a href=\"https:\/\/web.archive.org\/web\/20191002090949\/https:\/\/novascotia.ca\/natr\/forestry\/Forest_Review\/docs\/06252019\/June_25_Natural_Disturbance_Regimes.pdf\">NATURAL DISTURBANCE REGIMES<\/a> (5)<\/li>\n<li><a href=\"https:\/\/web.archive.org\/web\/20191002090949\/https:\/\/novascotia.ca\/natr\/forestry\/Forest_Review\/docs\/06252019\/June_25_Old_Forest.pdf\">OLD FOREST<\/a> (6)<\/li>\n<li><a href=\"https:\/\/web.archive.org\/web\/20191002090949\/https:\/\/novascotia.ca\/natr\/forestry\/Forest_Review\/docs\/06252019\/June_25_Outcomes_Based_Forestry.pdf\">OUTCOMES-BASED FOREST MANAGEMENT<\/a> (8)<\/li>\n<li><a href=\"https:\/\/web.archive.org\/web\/20191002090949\/https:\/\/novascotia.ca\/natr\/forestry\/Forest_Review\/docs\/06252019\/June_25_State_of_the_Forest_Report.pdf\">REPORTING ON THE STATE OF THE FOREST<\/a><\/li>\n<li><a href=\"https:\/\/web.archive.org\/web\/20191002090949\/https:\/\/novascotia.ca\/natr\/forestry\/Forest_Review\/docs\/06252019\/June_25_Small_Scale_Wood_Energy.pdf\">SMALL SCALE WOOD ENERGY INITIATIVE<\/a><\/li>\n<li><a href=\"https:\/\/web.archive.org\/web\/20191002090949\/https:\/\/novascotia.ca\/natr\/forestry\/Forest_Review\/docs\/06252019\/June_25_Species_at_Risk_Program.pdf\">SPECIES AT RISK PROGRAM RENEWAL<\/a><\/li>\n<\/ul>\n<p><strong><br \/>\n<\/strong>Projects listed with a number in parentheses are the projects relating directly to implementation of the Triad; the number is the Component # in the table below.<\/p>\n<p>The <a href=\"https:\/\/novascotia.ca\/ecological-forestry\/Environmental_Assessment.pdf\">ENVIRONMENTAL ASSESSMENT<\/a> project (#7 below)\u00a0 was added in the spring of 2020.<\/p>\n<p><strong><br \/>\nWhere we are now<br \/>\n<\/strong><\/p>\n<div id=\"attachment_148\" style=\"width: 650px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/versicolor.ca\/nstriad\/wp-content\/uploads\/2022\/07\/TriadTimelineV6.jpg\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-148\" class=\"size-full wp-image-148\" src=\"http:\/\/versicolor.ca\/nstriad\/wp-content\/uploads\/2022\/07\/TriadTimelineV6_640.jpg\" alt=\"\" width=\"640\" height=\"852\" srcset=\"https:\/\/versicolor.ca\/nstriad\/wp-content\/uploads\/2022\/07\/TriadTimelineV6_640.jpg 640w, https:\/\/versicolor.ca\/nstriad\/wp-content\/uploads\/2022\/07\/TriadTimelineV6_640-225x300.jpg 225w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/><\/a><p id=\"caption-attachment-148\" class=\"wp-caption-text\"><em>Click on image for larger version.\u00a0 <a href=\"http:\/\/versicolor.ca\/nstriad\/wp-content\/uploads\/2022\/07\/TriadStatus.odt\">ODT file<\/a><\/em><\/p><\/div>\n<p><strong>Footnotes<\/strong><br \/>\n1. SGEM: <a href=\"https:\/\/novascotia.ca\/ecological-forestry\/docs\/silvicultural-guide.pdf\">Silvicultural Guide for the Ecological Matrix<\/a><br \/>\n2. HPF: High Production Forestry. View <a href=\"https:\/\/novascotia.ca\/ecological-forestry\/docs\/HPF-phase1-report.pdf\">HPF Phase 1 Final Report<\/a><br \/>\n3. <a href=\"https:\/\/nslegislature.ca\/legc\/bills\/64th_1st\/3rd_read\/b057.htm\">Environmental Goals and Climate Change Reduction Act<\/a>, As Passed, Nov 5, 2021: \u201c10 The Government&#8217;s goals with respect to the protection of land are (a) to conserve at least 20% of the total land and water mass of the Province by 2030 as protected areas and other effective area-based conservation measures, including Indigenous Protected and Conserved Areas, in a manner consistent with national reporting criteria\u201d<br \/>\n4. In <a href=\"https:\/\/novascotia.ca\/ecological-forestry\/docs\/HPF-phase1-report.pdf\">HPF Phase 1 Final Report<\/a>, the amount of crown land potentially suitable for the HPF component of Triad management was estimated. Under Next Steps (p31): \u201cThe Department will initiate moving from a strategic modelling exercise to tactical and operational implementation. This will require policy decisions on total area to be committed to HPF management and the time frame for implementation&#8230;although key ranking criteria have been discussed as part of this report, the process for identifying HPF sites has yet to be finalized. Final identification and ranking of sites will need to be informed by an analysis of biodiversity and other values at a landscape level (including defining core habitat for species at risk), site visits to verify suitability, and consideration of other Forest Practices Review related objectives. Taken together, these factors will likely result in additional adjustments to the potential suitable HPF area.\u201d<br \/>\n5. The papers:<br \/>\n&#8211; <a href=\"https:\/\/www.nrcresearchpress.com\/doi\/10.1139\/er-2020-0015#.X1TG9WdKhQY\">A review of natural disturbances to inform implementation of ecological forestry in Nova Scotia, Canada<\/a><br \/>\nby Anthony R. Taylor et al., 2020. Published on the web in <em>Environmental Reviews<\/em> Aug. 18, 2020.<br \/>\n&#8211; <a href=\"https:\/\/cdnsciencepub.com\/doi\/full\/10.1139\/er-2021-0042\">Natural disturbance regimes for implementation of ecological forestry: a review and case study from Nova Scotia, Canada<\/a><br \/>\nby David A. MacLean et al., 2021 Environmental Reviews 4 August 2021 (Open Access paper).<br \/>\nView comments about the process <a href=\"https:\/\/web.archive.org\/web\/20210414120222\/http:\/\/nsforestnotes.ca\/2020\/09\/08\/an-assessment-of-nova-scotia-lfs-progress-in-implementing-ecological-forestry-in-response-to-the-lahey-report-part-3-the-project-muddle-8sep2020\/#NDR\">here<\/a><br \/>\n6. View <a href=\"http:\/\/versicolor.ca\/nstriad\/wp-content\/uploads\/2022\/07\/OldGrowthHFN_NSWFS8DEC2021.pdf\">comments on the The Draft Old Growth Forest Policy<\/a> submitted by D. Patriquin on behalf of the Halifax Field Naturalists and the NS Wild Flora Society; the Draft Policy is attached to this document. UPDATE 4Aug2022: the Draft Old Forest Policy is now posted on the <a href=\"https:\/\/novascotia.ca\/ecological-forestry\/\">Ecological Forestry page<\/a> under &#8220;Ecological Forestry Material: <a href=\"https:\/\/novascotia.ca\/ecological-forestry\/docs\/Draft-Old-Forest-Policy.pdf\">Draft Old Forest Policy \u2013 Consultation (2021) <\/a>(A revised policy had been anticipated by this time, but has not yet appeared &#8211; dp<br \/>\n7. View these posts on archived NSFN pages:<br \/>\n&#8211; <a href=\"https:\/\/web.archive.org\/web\/20210728075138\/https:\/\/nsforestnotes.ca\/2021\/05\/22\/draft-nova-scotia-forestry-ea-process-surfaces-21may2021\/\">Draft Nova Scotia Forestry EA Process surfaces 21May2021<\/a><br \/>\n&#8211; <a href=\"https:\/\/web.archive.org\/web\/20210518224603\/http:\/\/nsforestnotes.ca\/2020\/06\/16\/biodiversity-landscape-planning-for-nova-scotia-is-being-developed-as-part-of-the-lf-environmental-assessment-project-16jun2020\/\">Biodiversity Landscape Planning for Nova Scotia is being developed as part of the L&amp;F Environmental Assessment Project 16Jun2020<\/a><br \/>\nAccording to the <a href=\"https:\/\/novascotia.ca\/ecological-forestry\/Environmental_Assessment.pdf\">info doc<\/a>, we can still expect public consultation on the 20-year Stewardship Guide<br \/>\n8. View comments <a href=\"https:\/\/web.archive.org\/web\/20210414120222\/http:\/\/nsforestnotes.ca\/2020\/09\/08\/an-assessment-of-nova-scotia-lfs-progress-in-implementing-ecological-forestry-in-response-to-the-lahey-report-part-3-the-project-muddle-8sep2020\/#outcomes\">here<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Needs Updating: last updates Aug 4, 2022 The current* NS Government&#8217;s Commitment (clause 10 in the Environmental Goals and Climate Change Reduction Act, As Passed on Nov 5, 2021, bolding inserted): *A PC Government was elected with a majority\u00a0 on &hellip; <a href=\"https:\/\/versicolor.ca\/nstriad\/ns-triad\/timeline\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":0,"parent":68,"menu_order":25,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-92","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/versicolor.ca\/nstriad\/wp-json\/wp\/v2\/pages\/92","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/versicolor.ca\/nstriad\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/versicolor.ca\/nstriad\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/versicolor.ca\/nstriad\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/versicolor.ca\/nstriad\/wp-json\/wp\/v2\/comments?post=92"}],"version-history":[{"count":46,"href":"https:\/\/versicolor.ca\/nstriad\/wp-json\/wp\/v2\/pages\/92\/revisions"}],"predecessor-version":[{"id":1484,"href":"https:\/\/versicolor.ca\/nstriad\/wp-json\/wp\/v2\/pages\/92\/revisions\/1484"}],"up":[{"embeddable":true,"href":"https:\/\/versicolor.ca\/nstriad\/wp-json\/wp\/v2\/pages\/68"}],"wp:attachment":[{"href":"https:\/\/versicolor.ca\/nstriad\/wp-json\/wp\/v2\/media?parent=92"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}